What to Expect During a Bathroom Remodel: the 8 Steps, Explained
Why waterproofing is the step you should ask every contractor about, what moving a toilet really costs, and how long each phase takes — from a crew that has remodeled 400+ Northern Virginia homes.
✔ Licensed VA DPOR Class A contractor · ✔ 12+ years, 400+ NoVA projects · ✔ Free video estimate in 24 hours
The 8 steps of a bathroom remodel
Design & material selection
Tile, fixtures, vanity, and glass get chosen first — special-order tile is a common schedule-killer, so we order finishes before demolition starts.
Demolition (1 day)
Down to the studs and subfloor. In pre-1990s homes this is where hidden leaks, rot, or mold behind the old tub show up — hold a 10–15% contingency so a discovery doesn't stall the project.
Plumbing rough-in
Moving fixtures along the same wall: about $500–1,200. Relocating a toilet: $2,500–5,000 (the drain line has to move). Slab trenching adds $1,000–3,000. Keeping fixtures in place is the biggest money-saver in a bathroom.
Waterproofing — the non-negotiable step
Tile is not waterproof; the membrane behind it is. Cement board plus a dedicated waterproofing membrane in the wet area, then a water test before any tile goes up. A skipped membrane is a ceiling stain downstairs two years later.
Tile (2–4 days)
Walls, floor, niche, and correct slope to the drain. Labor is priced by complexity — small-format or diagonal patterns take longer.
Fixture installation
Toilet, tub or shower hardware, vanity, mirror, and lighting go in.
Shower glass (5–7 day wait)
Custom glass is measured only after tile is done, then fabricated. We use the wait for caulk, paint, and finish work so no days are wasted.
Water test & walkthrough
Final leak check, caulk inspection, punch list — then a 2-year workmanship warranty on our work.
Timeline & budget quick reference (2026)
| Scope | Typical turnkey range | On-site time |
|---|---|---|
| Fixture swap (keep tile) | $8K–15K | ~1 week |
| Half bath refresh | $7K–18K | ~1 week |
| 5×7 full bath | $20K–40K | 2–3 weeks |
| Standard full bath | $30K–65K | 2–3 weeks |
| Primary / master bath | $45K–100K | 3–4 weeks |
Buying your own tile and fixtures? Our labor-only model typically runs a fraction of turnkey. Full tier details on the bathroom remodeling price page — every project is quoted individually in writing.
Recent NoVA bathrooms by our crew
All photos are NWP projects, published with client permission. See the full project gallery →
Bathroom process FAQ
How long does a bathroom remodel take?
Standard full bath: 2–3 weeks on site, plus the 5–7 day shower-glass wait. Fixture swaps and half baths run about a week.
How much does it cost to move a toilet or shower?
Same-wall moves $500–1,200; toilet relocation $2,500–5,000; slab trenching adds $1,000–3,000. Keeping the layout is the biggest saver.
Why does waterproofing matter so much?
Tile and grout aren't waterproof — the membrane behind them is. We install cement board + membrane and run a water test before tiling. Ask any bidder to describe this step; the answer tells you a lot.
What surprises come up in older homes?
Hidden leaks, rot, or mold behind the old tub in pre-1990s homes. We document with photos and price any fix before proceeding — and recommend a 10–15% contingency so it never stalls the job.