Deck Building in Northern Virginia

Pressure-treated wood or low-maintenance composite β€” designed, permitted, and built by one in-house crew, typically in 1–2 weeks. Serving Fairfax, Vienna, Burke, Springfield, Centreville and surrounding NoVA communities.

βœ” Licensed VA DPOR Class A contractor  Β·  βœ” 12+ years, 400+ NoVA projects  Β·  βœ” Free video estimate in 24 hours

What a new deck costs in NoVA (2026)

TypeWhat's includedPrice / sqftTypical 300 sqft deck
Pressure-treated woodPT pine framing and decking, ground level$30–45$9K–13.5K
Composite (Trex-style)Composite decking and rails, low maintenance$45–75$13.5K–22.5K
Elevated / 2nd-storyStairs, railing, structural posts+30–50%β€”

Pricing reflects current Northern Virginia market rates and includes permits and inspections. Every deck is quoted individually in writing.

Two easy ways to get your price

πŸ“Ή Free video estimate $0

Take a short phone video of the space and send it to us. You'll have an accurate estimate within 24 hours β€” no visit, no pressure.

πŸ“ On-site measurement $100

We come out, measure, and confirm scope in person. The $100 is fully credited toward your project when you sign with us.

Recent NoVA projects by our crew

All photos are NWP projects, published with client permission. See the full project gallery β†’

FAQ

How much does a new deck cost in Northern Virginia?

Typical 2026 Northern Virginia rates: pressure-treated wood $30–45 per sqft, composite $45–75 per sqft. An elevated deck with stairs and railing adds 30–50%. A typical 300 sqft deck lands between $9K and $22.5K. Every deck is quoted individually in writing.

Wood or composite β€” which should I choose?

Pressure-treated wood costs less up front but needs staining and sealing every few years. Composite costs more but is essentially maintenance-free for decades β€” and recent Cost-vs-Value data for the DC metro shows composite decks recouping roughly their full cost at resale, making it one of the best-returning projects you can build.

Do I need a permit for a deck?

In most NoVA counties, yes β€” decks attached to the house or above a certain height require a permit and inspections. We handle the drawings, permit, and inspections as part of the job.

How long does a deck build take?

Most NoVA decks take about 1–2 weeks of on-site work once the permit is issued. Elevated decks and complex railing runs add time; your written quote includes the schedule.

Get your deck quote today

Chat with us 24/7 (English Β· δΈ­ζ–‡ Β· EspaΓ±ol), send photos, and get a ballpark on the spot.

πŸ’¬ Chat now at nwp2015.com πŸ“ž 703-485-6378